Summary:
Comprehensive
work experience, in Multi-Discipline Planning/Analysis,
Maintenance, Management, Engineering and Supervision
of projects. I have professional experience in power system planning and
analysis including assessment of transmission expansion and reinforcement plans,
preparation of functional specifications for transmission system requirements
for identified facilities, project monitoring and coordinating with Government
and regulatory bodies.
Recently, I have attained Masters in Electrical
Engineering with major in Power Systems. This gives me an up-to-date insight to
the present progresses in Power systems.
I have conducted transmission system impact
assessments and system performance studies for many Power system scenarios. The
studies included power planning using the state of the art analytical tools like
PSS/E program package.
Having also experience of
Transmission line and Substation design including budgeting and scheduling. I
have prepared and reviewed single line drawings for
electrical systems, Completed bills of materials (BOMs), engineering change
orders (ECOs) and notice of revisions (NORs).
Have extensive experience of
preparing the work packages on the basis of design for trade personnel to work
in the field.
Experience, working with cable and wiring database and installation, and
termination of cables.
I am highly proficient with
Computers and computer networks. Experience of working with lots of Engineering
programs and designing of systems databases. Advance user of MS Office etc.
Depending on my present studies and my past
experience, I can be an advantage to the jobs concerning Power systems/studies,
Transmission and Substation design, including project operations and system
database design.
Education/ Training:
·
Masters in Electrical Engineering
from
Concordia University, Montreal, QC, Canada.-05/2006
·
Ex-MBA (Project Management),
Preston University (USA),
at Lahore, Pak -1997
·
Bachelor of Science (B.Sc.) in
Electrical Engineering from
University of
Engineering and Technology (UET),
Lahore, Pakistan - 1989
·
Power System Operation and
Planning, Course from
McGill
University,
Montreal, QC- 2006.
·
Canadian Electrical Code
course from
Humber College, Toronto Canada- 2003.
·
Power System Reliability Assessment
training.
·
Power System Planning training at
WAPDA /
ACRES - 1996
·
Project Management training from
ACRES International Ltd. Canada. -1994
·
Training in transmission grid
system operation, thermal generation, distribution system operation and office
Management at WAPDA Academy.
·
Training on Communication Skills
(Presentation and Writing) from ACRES International Ltd. Canada.
Experience:
Zaman Consulting
ON,
CA 04/2003-
to-06/2004
·
Assisted in preparation of
cabling and wiring database
for generation Power Plant project in Ontario. Prepared
work packages on the basis of design to be used in the field.
S. E. Corporation (SEC), KSA
08/2000 –to
04/2002
·
Responsible for designing and developing the databases for
pre-qualification, procurement and invoices system for 380/132/33 kV
Transmission projects by using MS-Access database system. Preparation of single
line diagrams. Site supervision for on going 132kV substations projects.
Power System Planning,
WAPDA,
Pakistan
(a 17000 MW Electric Utility)
04/1997- 08/2000
·
Actively participated in updating medium and long term
transmission system expansion plans. Conducted load flow, short circuit and
transient stability analysis for the current and future system.
·
Analyzed various alternative plans on technical and economic
grounds, and prepared reports. This included from large projects such as
“transmission expansion of dispersal of power from 1350 MW Ghazi Barotha hydro
power project”, 3rd and 4th circuit 500 kV transmission
lines to small interconnections for independent private power producers.
·
Assisted in transmission interconnection studies for more than 20
new private generation projects of different sizes (total capacity was more than
4000 MW). The analyses identified the new transmission facilities required for
integrating these projects into WAPDA power system.
·
Assisted in determining the additional transmission reinforcement
requirements for enhancing the capability of the existing transmission system
for reliable power dispersal of these projects. A similar study was carried out
for a number of small candidate Hydro power projects.
·
Supported interaction with regulatory bodies and government
agencies such as NEPRA (National Electric Power Regulatory Authority) and
Ministry of water and power (Govt. of Pakistan).
·
Participated in the development of the sixth 5‑year secondary
transmission and grid stations plan (2001 to 2006) for reinforcement of power
supply to all eight area electricity boards in WAPDA system.
National Power Plan (NPP) Project,
ACRES
/
WAPDA
/
CIDA
08/1993- 04/1997
·
Active team member in development
of power system database for transmission lines, grid stations and generators
under CIDA funded National Power Plan
Project (NPP),
Pakistan with ACRES
International Ltd of
Canada.
·
Participated in development of
25-year power transmission expansion plans and conducted load flow, short
circuit and stability studies.
·
Participated in environmental
assessment of energy sector expansion plan under NPP project.
·
Conducted/participated in site
investigations and ranking and in conducting feasibility studies and preparation
of reports for power plants and EHV Transmission lines.
·
Carried out route investigation and
ranking among various transmission options.
Natural Gas Power Station, Steam Power Plant,
WAPDA,
Pakistan
04/1990-08/1993
·
Prepared the work packages on the
basis of design. Prepared and reviewed single line drawings for electrical
systems. Completed bills of materials (BOMs), engineering change orders (ECOs)
and notice of revisions (NORs). Prepared field change notices (FCN) as required.
·
Worked on the cabling and wiring
database and installation and termination of cables.
·
Wide knowledge and experience of
all the necessary equipment for power generating station. Performed
Commissioning of the system after modification or installation.
·
Supervised the construction of
132kV/11kV Substation. Scope of work included 2 x 132 kV Transformer breakers,
11 kV Switchboards with 7 feeders, 2x 40 MVA Transformers, related control,
protection equipments & auxiliaries etc.
·
Prepared periodic reports and
Efficiency Analysis of Power Plant on MS-Excel and MS-
Access softwares.
Skills:
·
Experienced user of
PSS/E ,
MatLab and
EMTP Software Packages.
·
Exceptional IT related experience.
(Including MS- AutoCAD etc.)
·
A team player capable of working
under pressure and meeting deadlines.
·
Listen and explain clearly and
effectively in a professional manner.
·
Excellent report writing.
IT Skills:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
-
US EPA AIR DISPERSION
MODEL
|
-
LAN/WAN (Design,
Networking, Troubleshooting
|
-
HEAT RATE AND AIR
EMISSION MODEL
|
|
Professional Memberships
·
Member
IEEE,
USA
·
PE
License of Ontario in Progress